Chicago Solar Installation Guide

Chicago Solar Permitting & Interconnection— Complete 2025 Guide

Navigate Chicago's solar installation process from initial assessment through ComEd Permission to Operate. Understand Express Permit limits, inspection requirements, and interconnection timelines.

Chicago Express Permit Program

Fast-track permitting for most residential solar installations

Express Permit Eligible
1-3 days
Solar Limit
Up to 13.44 kW DC
Battery Limit
Up to 20 kWh
Residential only
Roof-mounted
Standard setbacks
No structural modifications
Standard Plan Review
2-4 weeks
Solar Limit
Over 13.44 kW DC
Battery Limit
Over 20 kWh
Detailed engineering plans
Structural analysis
Electrical load calculations
Site plan

Step-by-Step Installation Process

From initial assessment to system activation, here's exactly what happens during your Chicago solar installation.

1

Roof Assessment & System Design

1-2 weeks

Comprehensive evaluation of your property and custom system design

Structural engineering analysis for roof capacity
Shading analysis using satellite imagery and site visit
Electrical panel evaluation and upgrade planning
Energy usage analysis and system sizing
HOA/historic district compliance review
2

Chicago Express Permit Application

1-3 days

Fast-track permitting for qualifying residential systems

Systems up to 13.44 kW DC qualify for Express Permit
Battery systems up to 20 kWh included
Online application through Chicago building portal
Automatic approval for compliant applications
Larger systems require Standard Plan Review (2-4 weeks)
3

Professional Installation

1-3 days

NABCEP-certified installation following Chicago building codes

Licensed electrical contractor performs all work
Chicago-specific fire setback requirements (3 feet)
Proper grounding and bonding per NEC standards
Smart inverter installation (IEEE 1547-2018 compliant)
System commissioning and performance testing
4

City of Chicago Inspection

1-2 weeks

Required electrical inspection before system activation

Schedule inspection through Chicago 311 system
Inspector verifies code compliance and safety
Common inspection items: grounding, labeling, disconnects
Corrections addressed immediately if needed
Inspection certificate issued upon approval
5

ComEd Interconnection (PTO)

2-6 weeks

Utility approval and net metering setup

Submit interconnection application to ComEd
Utility review of system specifications
Net metering agreement execution (supply-only credits for 2025+)
Smart meter installation if needed
Permission to Operate (PTO) issued

Special Considerations for Chicago Properties

Certain property types require additional approvals or have specific requirements beyond standard permitting.

Historic District Properties

Additional approvals required for landmark buildings

Certificate of Appropriateness from Landmarks Commission
Low-profile panel requirements
Color and visibility restrictions
Extended review timeline (4-8 weeks additional)

Chicago Department of Planning and Development

HOA/Condo Association Properties

Illinois law protects solar rights with reasonable restrictions

Illinois Homeowners' Energy Policy Statement Act (765 ILCS 165)
HOAs cannot prohibit solar installations
Reasonable aesthetic guidelines allowed
Written notification to HOA recommended

Illinois General Assembly statute reference

Flat Roof Installations

Special considerations for Chicago's common flat roof buildings

Ballasted mounting systems preferred
Wind uplift calculations required
Snow load analysis for Chicago climate
Parapet wall integration planning

Structural engineer consultation included

Typical Project Timeline

Most Chicago residential solar projects are completed within 6-10 weeks from contract signing to system activation.

Express Permit Track

Design & Engineering1-2 weeks
Express Permit1-3 days
Installation1-3 days
City Inspection1-2 weeks
ComEd PTO2-6 weeks
Total Timeline6-10 weeks

Standard Review Track

Design & Engineering2-3 weeks
Standard Plan Review2-4 weeks
Installation2-5 days
City Inspection1-2 weeks
ComEd PTO2-6 weeks
Total Timeline8-14 weeks

Official Resources & Contacts

Direct links to Chicago and ComEd resources for permits, inspections, and interconnection.

Chicago Building Permits

Online permit applications and status tracking

chicago.gov/permits
Call 311 for permit questions

Chicago Landmarks Commission

Historic district approvals and guidelines

chicago.gov/landmarks
Department of Planning and Development

ComEd Interconnection

Net metering applications and PTO process

comed.com/interconnection
1-800-EDISON-1

Illinois General Assembly

HOA solar rights statute (765 ILCS 165)

ilga.gov
Legal reference for solar rights

Chicago 311

Inspection scheduling and city services

311.chicago.gov
Call 311 or use mobile app

NABCEP Certification

Verify installer certifications

nabcep.org
Professional certification database